Galvanized Steel Coil Inquiry | 0.21–0.5mm High Strength and Building Material Requirements

分享
商品描述
  • Coating
    Z30~Z40
    Hardness
    Full Hard
  • Spangle Type
    Regular Spangle
    Thickness
    0.21 mm ~ 0.50 mm, 0.14-0.8mm or customized
  • Type
    Steel Coil
    Application
    Making Pipes, Cutting Sheets, Making Small Tools, Making Corrugated Sheets, Making Fences
  • Certificate
    API , CE, BIS, JIS, Gs, ISO 9001
    Delivery Time
    within 7 days
  • Grade
    Galvanized Steel
    Length
    customized
  • Oiled or Non-oiled
    Non-oiled
    Processing Service
    Decoiling, Bending, Cutting, Punching, Welding
  • Skin Pass
    Yes
    Standard
    ASTM
  • Technique
    Cold Rolled Based
    Tolerance
    ±1%
  • Product Name
    Galvanized Steel Coil
    Shape
    Flat Coil
  • Surface
    Galvanized Coated
    Technology
    Cold Rolled Hot Dipped
  • Material
    ASTM/AISI/SGCC/CGCC/TDC51DZM/TDC52DTS350GD/TS550GD/DX51D+Z Q195-q345
    MOQ
    3 Ton
  • Payment term
    30%TT Advance + 70% Balance
    Delivery time
    within 7 days
  • Package
    Standard Seaworth Packing

Agree the actual substrate and mechanical acceptance before ordering this galvanized building material.

Grade and strength

The record lists several steel designations without a numeric strength tied to a selected grade. State the required base material and mechanical tests rather than treating high-strength wording as a verified property.

Thickness and width

A 0.21–0.5 mm request appears with another 0.14–0.8 mm description. Confirm actual thickness, usable width and custom supply requirements instead of assuming every width range represents a stocked size.

  • Actual substrate designation
  • Mechanical test requirements
  • Confirmed thickness and width
  • Coating code and surface condition
  • Cutting or forming acceptance

Coating evidence

Cold rolled base, hot dipping and a zinc code are described. Agree coating measurement and any additional precoat system; no BIS, JIS, GS or EN certification, outdoor lifetime or finished building performance is established.