1 1/2 Inch BS Galvanized Scaffolding Pipe Inquiry | Q235B Hot Dip ERW Round Tube Requirements

分享
商品描述
  • Invoicing
    By Actual Weight
    Oiled or Non-oiled
    Shop Primer and Shot Blasting
  • Section Shape
    Round
    Surface Treatment
    Galvanized
  • Tolerance
    ±1%
    Alloy Or Not
    Non-Alloy
  • Application
    Fluid Pipe, Boiler Pipe, Drill Pipe, Hydraulic Pipe, Gas Pipe, Oil Pipe, Chemical Fertilizer Pipe, Structure Pipe, Other
    Certificate
    API , CE, BSI, BIS, KS, JIS, Gs, ISO 9001
  • Delivery Time
    within 7 days
    Grade
    Q235B
  • Outer Diameter
    21 - 219 mm
    Processing Service
    Welding, Punching, Cutting, Bending, Decoiling
  • Special Pipe
    API Pipe, Other, EMT Pipe, Thick Wall Pipe
    Standard
    BS
  • Technique
    ERW
    Product name
    Galvanized Steel Tube
  • Length
    1-12m
    Surface
    Galvanized Coating
  • Type
    Welded ERW
    Shape
    Round Pipe Tube
  • Material
    Q235/Q235B/Q345/Q345B
    Keyword
    Galvanzied Steel Pipe
  • Usage
    Oil Gas Sewage Transport
    MOQ
    1 Ton
  • Packing
    Standard Seaworthy Packing

Confirm actual scaffold tube geometry and surface before selecting material for a support system.

Size convention

The title requests 1½ inch while the detail gives a broad OD range and 1–9 mm wall option. Define nominal versus measured size and select compatible OD, wall and 6 or 12 m length instead of deriving a complete scaffold specification from the title.

Material and surface

Q235B and ERW are listed with galvanizing and a shop primer/shot blasting field. Agree actual material, hot dip or other delivered surface and coating inspection without treating all descriptions as one verified finish.

  • Actual Q235B material
  • Nominal convention and measured OD
  • Compatible wall and length
  • Selected coating and surface
  • Scaffold connection inspection

System acceptance

BS and scaffolding wording supplies no assembly design result. Request actual material and support-system records; no scaffold load rating, connection compatibility, pressure capability or certified compliance is established.